Anya Ledwith on the best ways to rate the significance of environmental aspects within an environment management system

The foundation of a good quality environment management system (EMS) is an understanding of the organisation’s aspects and impacts. This information should be used to recognise the need for, and determine the type of, operational controls required. Developing a process to rank these aspects for significance ensures that the EMS is not overwhelmed from the start.

Avoiding confusion

There is sometimes confusion in differentiating between environmental aspects and impacts. ISO 14001 defines aspects as activities, products or services that can interact with the environment, while impacts are any change to the environment (adverse or beneficial) resulting from an aspect.

So, for example, consider business journeys by car:

  • activity – driving a car
  • aspect – use of diesel as fuel
  • impact – resulting air pollution

In its initial environmental review, the organisation will look for aspects and impacts relating to all activities, products and services. This is a detailed process covering normal, abnormal and emergency conditions, to identify aspects arising from its past, existing or planned activities. It should consider the aspects that it can control (such as its own energy consumption) or those it can influence (the activities of its contractors). Organisations are not expected to manage issues outside their sphere of influence or control.

The scope of the environmental review extends across the organisation, from the back office to manufacturing lines, service delivery and business travel. It should examine the materials used and wastes produced, as well as the activities of contractors, suppliers and even customers. Producing an “aspects register” that also details arising environmental impacts is an extensive process and one that often results in copious amounts of information which will need to be managed.

Taking precedence

Normal conditions, by their definition, are more common than abnormal or emergency situations, but which take precedence? Similar sites may have different operating times, or levels of output, but can they be addressed in the same way? Is it possible to compare a few kilos of hazardous waste to large quantities of paper? Meanwhile, some aspects will have greater impacts or are regulated by legislation, so should they receive the same attention as others?

Clearly, an organisation cannot and should not manage everything equally and all at once; it needs to prioritise so the more important (or significant) aspects are dealt with first and/or with greater scrutiny.

Significance ratings allow an organisation to decide on the appropriate control measures and timescales, enabling it to manage its environmental aspects in a considered manner.

So, what is significant? If we look to 14001; it states that a “significant environmental aspect has, or can have, a significant environmental impact”.

However, 14001 does not specify requirements on how to determine significance. The EMS general guidelines (ISO 14004) are a little more helpful, noting that significance can be applied either to environmental aspects or to their associated impacts, usually the latter. Often, a mixture of the two is evaluated while considering:

  • environmental criteria (such as impact severity or frequency of the aspect);
  • applicable legal requirements (like specified waste quantities or discharge permit limits); and
  • stakeholder concerns (for example staff interests, public image, noise or odour).

Evaluating significance involves both technical analysis and judgment, so one person may interpret the results differently from another, and what applies to one organisation may not apply to another.

Providing consistency

Establishing formal criteria should help to provide consistency. ISO standards, of course, require records to be kept. A documented procedure is essential, but it should not be overly complex (leaving it difficult to understand) or too simplistic (forcing many assumptions to be made), otherwise there is a risk that variations will be introduced.

The methodology must be relevant to the organisation using it: an office-based company and a manufacturing firm, for example, will have distinct aspects that affect the environment and the businesses very differently.

There are numerous and varied methodologies, developed by organisations from different sectors over the years. Examples include:

  • Cardiff & Vale NHS Trust uses a simple 5x5 scoring matrix, which scores aspects and impacts against two broad categories: “control” and “severity”. Control of the aspect is scored from one, where there is a high degree of control in place, to five, where there is negligible or no control. Severity of the impact ranges from one (insignificant or positive impact) to five (severe). The scores are multiplied to give results up to 25 and ranked as low significance (1–6), medium (8–10) or high (12–25).
  • Electronics manufacturer Raytheon Systems also uses a 5x5 matrix, which compares “likelihood” against “severity”, with a maximum score of 25. Although legislation is not included in the numerical scoring system, it is considered in the aspects register, which, at nearly 300 lines long, includes a range of aspects, such as energy consumption, use of chemicals and disposal of hazardous waste. Unusually, each aspect is scored twice, both before and after controls are implemented, to show how risks are managed.
  • Design and print company Easibind, by contrast, uses a two-stage approach, which compares “likelihood” and “severity” and includes a detailed procedure for evaluation. A risk matrix is used to provide risk ratings (from very low to very high) rather than a numerical score. These ratings are used to classify the aspect (see below).
  • Crawley Borough Council uses a comprehensive method to consider a range of issues, including influence, severity, duration, cumulative effect, legislation and stakeholder interest. A single score (from one to five) is given, with four or five deemed significant. This process, while thorough, appears more complicated to follow than a matrix without detailed guidance on scoring.
  • Accountancy firm KPMG has an interesting approach, which recognises the nature of the organisation and its associated aspects. Each aspect or impact is assessed against a set of clearly defined criteria at the function level, producing scores of one, two or three. The sum of the scores for each aspect is then ranked as having a high environmental significance (if it is more than 11), limited significance or no significance. The criteria used to assess the severity of environmental impacts include: business disruption, financial loss and reputation.

Perhaps one simplified matrix is too basic for the range of aspects likely to be encountered. A slightly more detailed system, tailored to the relevant needs and activities of the organisation, is preferable.

A bespoke risk matrix could, for example, include categories such as CO2 emissions (amount of carbon produced); frequency (how often the aspect occurs); severity (degree of impact on the environment); likelihood (probability impact will occur); controllable (extent of control or influence, and resources required); and regulated (degree of regulation).

These are fairly standard categories, but a tailored approach means they can be supplemented by others that are important to the organisation, such as stakeholder interest, financial impact or business continuity.

Each category must then be scored for significance – using five levels of severity is a common approach. Taking the above categories as examples, these levels could range from “minimal” to “major” for CO2 emissions; “seldom” to “repeated” for frequency; and “improbable” to “very likely” for likelihood. Short explanations should support the terminology, clarifying, for example, that “intermittent” frequency means occurring at intervals of one to six months, while “regular” means intervals of one to four weeks.

Scoring is then applied on a scale of 1–5, with, for instance, “minimal” carbon emissions scoring one, and “major” scoring five. Under such a matrix, an overall score of 19 or more would be regarded significant.

Ongoing process

Whichever method is chosen, determining significance is not a one-off project. It should be undertaken regularly, and particularly when there has been changes to activities; after the acquisition of new sites; or following an incident. 14001 auditors look for a formal procedure that is properly understood and applied. Non-conformances may be raised against the method, but are more likely to arise from how it is applied.

When developing an approach, keep it simple, make it relevant and ensure it is replicable. And don’t forget to review it regularly.

Subscribe

Subscribe to IEMA's newsletters to receive timely articles, expert opinions, event announcements, and much more, directly in your inbox.


Transform articles

Weather damage insurance claims hit record high

Weather-related damage to homes and businesses saw insurance claims hit a record high in the UK last year following a succession of storms.

18th April 2024

Read more

The Science Based Targets initiative (SBTi) has issued a statement clarifying that no changes have been made to its stance on offsetting scope 3 emissions following a backlash.

16th April 2024

Read more

One of the world’s most influential management thinkers, Andrew Winston sees many reasons for hope as pessimism looms large in sustainability. Huw Morris reports

4th April 2024

Read more

Vanessa Champion reveals how biophilic design can help you meet your environmental, social and governance goals

4th April 2024

Read more

Alex Veitch from the British Chambers of Commerce and IEMA’s Ben Goodwin discuss with Chris Seekings how to unlock the potential of UK businesses

4th April 2024

Read more

A project promoter’s perspective on the environmental challenges facing new subsea power cables

3rd April 2024

Read more

Senior consultant, EcoAct

3rd April 2024

Read more

Around 20% of the plastic recycled is polypropylene, but the diversity of products it protects has prevented safe reprocessing back into food packaging. Until now. David Burrows reports

3rd April 2024

Read more

Media enquires

Looking for an expert to speak at an event or comment on an item in the news?

Find an expert

IEMA Cookie Notice

Clicking the ‘Accept all’ button means you are accepting analytics and third-party cookies. Our website uses necessary cookies which are required in order to make our website work. In addition to these, we use analytics and third-party cookies to optimise site functionality and give you the best possible experience. To control which cookies are set, click ‘Settings’. To learn more about cookies, how we use them on our website and how to change your cookie settings please view our cookie policy.

Manage cookie settings

Our use of cookies

You can learn more detailed information in our cookie policy.

Some cookies are essential, but non-essential cookies help us to improve the experience on our site by providing insights into how the site is being used. To maintain privacy management, this relies on cookie identifiers. Resetting or deleting your browser cookies will reset these preferences.

Essential cookies

These are cookies that are required for the operation of our website. They include, for example, cookies that enable you to log into secure areas of our website.

Analytics cookies

These cookies allow us to recognise and count the number of visitors to our website and to see how visitors move around our website when they are using it. This helps us to improve the way our website works.

Advertising cookies

These cookies allow us to tailor advertising to you based on your interests. If you do not accept these cookies, you will still see adverts, but these will be more generic.

Save and close